top of page

Houston Methodist Hospital OPC Level 16 MRI Installation
TTG recently completed a new MRI at Houston Methodist Hospital Outpatient Center.
​
This project consisted a the construction of approximately 1,300 SF on the 16th floor of the Outpatient Center to provide one MRI room, one equipment room, and an expanded control room. During which time the Owner continued to occupy adjacent portions of the existing building during the entire construction period.
​
Click to watch the video!




1/1
bottom of page